Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
01/24 00:00 0.00 4.22 11 12.24
01/24 01:00 0.00 4.22 11 12.19
01/24 02:00 0.00 4.22 11 12.19
01/24 03:00 0.01 4.22 11 12.19
01/24 04:00 0.00 4.22 11 12.13
01/24 05:00 0.00 4.22 11 12.13
01/24 06:00 0.00 4.22 11 12.13
01/24 07:00 0.01 4.22 11 12.13
01/24 08:00 0.00 4.22 11 12.13
01/24 09:00 0.00 4.23 11 12.07
01/24 10:00 0.00 4.23 11 12.13
01/24 11:00 0.00 4.23 11 12.24
01/24 12:00 0.00 4.23 11 12.77
01/24 13:00 0.00 4.23 11 12.71
01/24 14:00 0.00 4.23 11 12.89
01/24 15:00 0.00 4.23 11 12.89
01/24 16:00 0.00 4.23 11 12.71
01/24 17:00 0.00 4.23 11 12.48
01/24 18:00 0.00 4.23 11 12.36
01/24 19:00 0.00 4.23 11 12.30
01/24 20:00 0.00 4.23 11 12.24
01/24 21:00 0.00 4.23 11 12.24
01/24 22:00 0.00 4.23 11 12.19
01/24 23:00 0.00 4.23 11 12.19