BXTK1: Spring River at Baxter Springs

                                SHEF ID:       BXTK1     SPRING R NR BAXTER SPRINGS, KS
STATION TYPE:

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/18 00:00 0.00 3.34 621 12.46
04/18 01:00 0.00 3.34 621 12.45
04/18 02:00 0.00 3.33 609 12.44
04/18 03:00 0.00 3.33 609 12.41
04/18 04:00 0.00 3.34 621 12.38
04/18 05:00 0.00 3.33 609 12.37
04/18 06:00 0.00 3.32 598 12.36
04/18 07:00 0.00 3.32 598 12.34
04/18 08:00 0.00 3.32 598 12.40
04/18 09:00 0.00 3.32 598 12.59
04/18 10:00 0.00 3.32 598 12.96
04/18 11:00 ---- ---- ---- ----
04/18 12:00 ---- ---- ---- ----
04/18 13:00 ---- ---- ---- ----
04/18 14:00 ---- ---- ---- ----
04/18 15:00 ---- ---- ---- ----
04/18 16:00 ---- ---- ---- ----
04/18 17:00 ---- ---- ---- ----
04/18 18:00 ---- ---- ---- ----
04/18 19:00 ---- ---- ---- ----
04/18 20:00 ---- ---- ---- ----
04/18 21:00 ---- ---- ---- ----
04/18 22:00 ---- ---- ---- ----
04/18 23:00 ---- ---- ---- ----
Data processed at Thu 18Apr2024 15:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BAXT.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BAXT.Stage.Inst.1Hour.0.Ccp-Rev
BAXT.Flow.Inst.1Hour.0.Ccp-Rev
BAXT.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.