BXTK1: Spring River at Baxter Springs

                                SHEF ID:       BXTK1     SPRING R NR BAXTER SPRINGS, KS
STATION TYPE:

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/12 00:00 0.00 3.89 1498 12.58
03/12 01:00 0.00 3.87 1462 12.57
03/12 02:00 0.00 3.85 1427 12.56
03/12 03:00 0.00 3.84 1409 12.54
03/12 04:00 0.00 3.82 1374 12.53
03/12 05:00 0.00 3.81 1357 12.53
03/12 06:00 0.00 3.79 1323 12.52
03/12 07:00 0.00 3.78 1306 12.51
03/12 08:00 0.00 3.76 1273 12.50
03/12 09:00 0.00 3.76 1273 13.12
03/12 10:00 0.00 3.75 1256 13.53
03/12 11:00 0.00 3.73 1224 14.36
03/12 12:00 0.00 3.73 1224 14.28
03/12 13:00 0.00 3.71 1191 14.18
03/12 14:00 0.00 3.70 1175 14.21
03/12 15:00 0.00 3.69 1159 14.08
03/12 16:00 0.00 3.69 1159 14.06
03/12 17:00 0.00 3.69 1159 13.95
03/12 18:00 0.00 3.68 1143 13.53
03/12 19:00 0.00 3.68 1143 13.27
03/12 20:00 0.00 3.68 1143 12.70
03/12 21:00 0.00 3.69 1159 12.67
03/12 22:00 0.00 3.68 1143 12.66
03/12 23:00 0.00 3.67 1128 12.63
Data processed at Wed 13Mar2024 04:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BAXT.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BAXT.Stage.Inst.1Hour.0.Ccp-Rev
BAXT.Flow.Inst.1Hour.0.Ccp-Rev
BAXT.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.