BGSO2: Deep Fork River, Beggs, Okla

                                
SHEF ID:       BGSO2     Deep Fork near Beggs, OK
STATION TYPE:  
Regulating: Stage =    18.00, Flow =     8600

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
07/22 00:00      0.00      2.53      ----       588     11.95
07/22 01:00      0.00      2.52      ----       585     11.94
07/22 02:00      0.00      2.51      ----       583     11.93
07/22 03:00      0.00      2.52      ----       585     11.94
07/22 04:00      0.00      2.50      ----       580     11.91
07/22 05:00      0.00      2.50      ----       580     11.88
07/22 06:00      0.00      2.49      ----       577     11.88
07/22 07:00      0.00      2.48      ----       574     11.84
07/22 08:00      0.00      2.48      ----       574     11.88
07/22 09:00      0.00      2.47      ----       570     12.16
07/22 10:00      0.00      2.47      ----       570     12.53
07/22 11:00      0.00      2.46      ----       567     12.61
07/22 12:00      0.00      2.46      ----       567     12.61
07/22 13:00      0.00      2.45      ----       564     12.62
07/22 14:00      0.00      2.44      ----       561     12.47
07/22 15:00      0.00      2.44      ----       561     12.44
07/22 16:00      0.00      2.44      ----       561     12.35
07/22 17:00      0.00      2.43      ----       557     12.23
07/22 18:00      0.00      2.42      ----       554     12.08
07/22 19:00      0.00      2.42      ----       554     12.14
07/22 20:00      0.00      2.42      ----       554     12.13
07/22 21:00      0.00      2.42      ----       554     11.90
07/22 22:00      0.00      2.42      ----       554     11.91
07/22 23:00      0.00      2.40      ----       548     11.89

                            
Data processed at Sun 23Jul2023 04:32 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BEGG.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BEGG.Stage.Inst.1Hour.0.Ccp-Rev
BEGG.Stage-Alt.Inst.1Hour.0.Ccp-Rev
BEGG.Flow.Inst.1Hour.0.Ccp-Rev
BEGG.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.