BGSO2: Deep Fork River, Beggs, Okla

                                
SHEF ID:       BGSO2     Deep Fork near Beggs, OK
STATION TYPE:  
Regulating: Stage =    18.00, Flow =     8600

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
07/21 00:00      0.00      2.76      ----       651     11.90
07/21 01:00      0.00      2.74      ----       645     11.91
07/21 02:00      0.00      2.75      ----       648     11.87
07/21 03:00      0.00      2.73      ----       642     11.80
07/21 04:00      0.00      2.72      ----       639     11.87
07/21 05:00      0.00      2.72      ----       639     11.77
07/21 06:00      0.00      2.70      ----       634     11.75
07/21 07:00      0.00      2.70      ----       634     11.75
07/21 08:00      0.00      2.68      ----       628     11.75
07/21 09:00      0.00      2.67      ----       626     11.81
07/21 10:00      0.00      2.67      ----       626     11.94
07/21 11:00      0.00      2.65      ----       620     12.24
07/21 12:00      0.00      2.64      ----       617     12.49
07/21 13:00      0.00      2.64      ----       617     12.75
07/21 14:00      0.00      2.63      ----       615     12.50
07/21 15:00      0.00      2.61      ----       609     12.70
07/21 16:00      0.00      2.60      ----       607     12.49
07/21 17:00      0.00      2.59      ----       604     12.30
07/21 18:00      0.00      2.58      ----       601     12.26
07/21 19:00      0.00      2.58      ----       601     12.21
07/21 20:00      0.00      2.56      ----       596     12.19
07/21 21:00      0.00      2.56      ----       596     12.02
07/21 22:00      0.00      2.55      ----       593     11.94
07/21 23:00      0.00      2.55      ----       593     11.95

                            
Data processed at Sat 22Jul2023 04:31 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BEGG.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BEGG.Stage.Inst.1Hour.0.Ccp-Rev
BEGG.Stage-Alt.Inst.1Hour.0.Ccp-Rev
BEGG.Flow.Inst.1Hour.0.Ccp-Rev
BEGG.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.