Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/31 00:00 0.00 391.67 371.93 13.80 08/31 01:00 0.00 391.78 371.70 13.10 08/31 02:00 0.00 391.67 371.09 13.40 08/31 03:00 0.00 391.58 371.30 13.70 08/31 04:00 0.00 391.71 371.70 13.10 08/31 05:00 0.00 391.72 371.41 13.80 08/31 06:00 0.00 391.60 371.61 13.80 08/31 07:00 0.00 391.62 371.51 13.40 08/31 08:00 0.00 391.70 371.56 13.20 08/31 09:00 0.00 391.49 372.10 13.10 08/31 10:00 0.00 391.39 372.42 13.60 08/31 11:00 0.00 391.64 372.04 13.20 08/31 12:00 0.00 391.62 371.90 13.40 08/31 13:00 0.00 391.48 371.72 13.20 08/31 14:00 0.00 391.49 372.24 13.30 08/31 15:00 0.00 391.32 372.86 13.00 08/31 16:00 0.00 391.50 372.82 13.50 08/31 17:00 0.00 391.62 372.56 12.90 08/31 18:00 0.00 391.66 372.52 13.20 08/31 19:00 0.00 391.74 372.47 13.50 08/31 20:00 0.00 391.82 372.33 13.30 08/31 21:00 0.00 391.87 372.01 13.30 08/31 22:00 0.00 391.83 371.35 13.30 08/31 23:00 0.00 391.49 371.63 13.10