Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/30 00:00 0.01 391.42 371.69 13.30 08/30 01:00 0.00 391.59 371.96 13.60 08/30 02:00 0.00 391.57 371.69 13.20 08/30 03:00 0.00 391.39 371.53 13.70 08/30 04:00 0.00 391.49 371.40 13.20 08/30 05:00 0.00 391.56 371.61 13.50 08/30 06:00 0.00 391.50 371.87 13.70 08/30 07:00 0.00 391.43 371.68 13.80 08/30 08:00 0.00 391.54 371.51 13.70 08/30 09:00 0.00 391.52 371.55 13.80 08/30 10:00 0.00 391.45 371.61 13.60 08/30 11:00 0.00 391.69 372.21 13.20 08/30 12:00 0.00 391.65 372.22 13.50 08/30 13:00 0.00 391.58 371.97 13.20 08/30 14:00 0.00 391.54 372.15 13.10 08/30 15:00 0.00 391.64 372.46 13.40 08/30 16:00 0.00 391.55 372.45 13.40 08/30 17:00 0.00 391.52 372.29 13.00 08/30 18:00 0.00 391.48 372.30 13.00 08/30 19:00 0.00 391.54 372.08 13.30 08/30 20:00 0.00 391.60 372.05 13.10 08/30 21:00 0.00 391.88 371.10 13.70 08/30 22:00 0.00 391.92 371.15 13.60 08/30 23:00 0.00 391.46 371.82 13.60