Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/28 00:00 0.00 391.64 371.62 13.10 08/28 01:00 0.00 391.63 371.69 13.20 08/28 02:00 0.00 391.48 371.47 13.10 08/28 03:00 0.00 391.54 371.63 13.10 08/28 04:00 0.00 391.62 371.67 13.00 08/28 05:00 0.00 391.56 371.68 13.70 08/28 06:00 0.00 391.50 371.69 13.20 08/28 07:00 0.00 391.56 371.59 13.10 08/28 08:00 0.00 391.58 371.59 13.10 08/28 09:00 0.00 391.52 371.72 13.10 08/28 10:00 0.00 391.53 371.42 13.60 08/28 11:00 0.00 391.56 371.61 13.00 08/28 12:00 0.00 391.56 371.51 13.30 08/28 13:00 0.00 391.51 371.54 13.20 08/28 14:00 0.00 391.60 371.65 13.50 08/28 15:00 0.00 391.54 371.64 13.10 08/28 16:00 0.00 391.53 371.60 13.10 08/28 17:00 0.05 391.67 371.83 13.00 08/28 18:00 0.37 391.76 372.07 13.10 08/28 19:00 0.01 391.80 371.78 13.40 08/28 20:00 0.00 391.73 371.82 13.50 08/28 21:00 0.00 391.66 371.31 13.50 08/28 22:00 0.00 391.37 371.39 13.10 08/28 23:00 0.00 391.52 371.87 13.00