Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/27 00:00 0.00 391.63 371.54 13.00 08/27 01:00 0.00 391.68 371.80 13.00 08/27 02:00 0.00 391.72 371.76 13.20 08/27 03:00 0.00 391.51 371.59 13.60 08/27 04:00 0.00 391.61 371.52 13.80 08/27 05:00 0.00 391.64 371.68 13.10 08/27 06:00 0.00 391.59 371.81 13.10 08/27 07:00 0.00 391.54 371.55 13.70 08/27 08:00 0.00 391.64 371.71 13.10 08/27 09:00 0.00 391.60 371.57 13.30 08/27 10:00 0.00 391.54 370.97 13.10 08/27 11:00 0.00 391.54 371.68 13.00 08/27 12:00 0.00 391.61 371.77 13.60 08/27 13:00 0.00 391.56 371.69 13.70 08/27 14:00 0.00 391.53 371.65 13.00 08/27 15:00 0.00 391.57 371.46 13.30 08/27 16:00 0.00 391.38 372.34 13.00 08/27 17:00 0.00 391.75 372.16 13.00 08/27 18:00 0.00 391.66 371.67 13.00 08/27 19:00 0.00 391.63 371.82 13.60 08/27 20:00 0.00 391.71 371.10 13.00 08/27 21:00 0.00 391.88 371.20 13.00 08/27 22:00 0.00 391.59 371.34 13.00 08/27 23:00 0.00 391.40 371.61 13.10