Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/09 00:00 0.00 391.62 371.19 13.40 08/09 01:00 0.00 391.79 370.83 13.60 08/09 02:00 0.00 391.71 370.73 13.10 08/09 03:00 0.00 391.57 370.59 13.50 08/09 04:00 0.00 391.41 371.04 13.10 08/09 05:00 0.00 391.64 371.18 13.10 08/09 06:00 0.00 391.64 371.05 13.30 08/09 07:00 0.00 391.56 370.86 13.10 08/09 08:00 0.00 391.54 370.76 13.10 08/09 09:00 0.00 391.41 371.26 13.80 08/09 10:00 0.00 391.70 372.36 13.70 08/09 11:00 0.00 391.63 372.51 13.30 08/09 12:00 0.00 391.55 372.51 13.20 08/09 13:00 0.00 391.57 372.08 13.70 08/09 14:00 0.00 391.56 372.24 13.30 08/09 15:00 0.00 391.49 372.21 13.20 08/09 16:00 0.00 391.54 372.11 13.30 08/09 17:00 0.00 391.53 371.86 13.30 08/09 18:00 0.00 391.51 366.73 13.00 08/09 19:00 0.00 391.49 371.65 13.20 08/09 20:00 0.00 391.50 370.62 13.50 08/09 21:00 0.00 391.51 371.37 13.70 08/09 22:00 0.00 391.46 372.00 13.20 08/09 23:00 0.00 391.44 372.51 13.30