Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/08 00:00 0.00 391.51 370.70 13.10 08/08 01:00 0.00 391.62 370.63 13.50 08/08 02:00 0.00 391.61 370.49 13.70 08/08 03:00 0.00 391.48 370.47 13.80 08/08 04:00 0.00 391.58 370.62 13.80 08/08 05:00 0.00 391.60 370.71 13.20 08/08 06:00 0.00 391.56 370.55 13.10 08/08 07:00 0.00 391.51 370.53 13.10 08/08 08:00 0.00 391.59 370.52 13.50 08/08 09:00 0.00 391.50 370.53 13.40 08/08 10:00 0.00 391.77 371.32 13.00 08/08 11:00 0.00 391.82 371.38 13.20 08/08 12:00 0.00 391.81 371.84 13.20 08/08 13:00 0.00 391.79 371.67 13.20 08/08 14:00 0.00 391.73 371.77 13.10 08/08 15:00 0.00 391.68 371.94 13.10 08/08 16:00 0.00 391.66 371.69 13.60 08/08 17:00 0.00 391.51 371.44 13.80 08/08 18:00 0.00 391.61 371.00 13.20 08/08 19:00 0.00 391.60 370.70 13.30 08/08 20:00 0.00 391.59 370.49 13.30 08/08 21:00 0.00 391.59 370.57 13.50 08/08 22:00 0.00 391.61 370.94 13.20 08/08 23:00 0.00 391.61 371.14 13.40