Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/29 00:00 0.02 391.77 371.47 12.90 07/29 01:00 0.06 392.02 371.08 13.20 07/29 02:00 0.03 391.60 371.22 13.10 07/29 03:00 0.00 391.53 371.31 13.10 07/29 04:00 0.00 391.70 371.35 13.10 07/29 05:00 0.00 391.76 371.36 13.60 07/29 06:00 0.00 391.52 371.17 13.70 07/29 07:00 0.01 391.57 371.34 13.30 07/29 08:00 0.00 391.69 371.47 13.20 07/29 09:00 0.22 391.66 370.45 13.70 07/29 10:00 0.56 391.55 371.12 13.60 07/29 11:00 0.29 391.64 371.27 13.50 07/29 12:00 0.03 391.73 371.93 13.20 07/29 13:00 0.00 391.76 371.99 13.20 07/29 14:00 0.00 391.79 371.99 12.90 07/29 15:00 0.01 391.75 372.37 13.60 07/29 16:00 0.00 391.82 372.16 13.00 07/29 17:00 0.00 391.81 372.02 13.30 07/29 18:00 0.00 391.77 372.01 13.20 07/29 19:00 0.00 391.75 372.01 13.10 07/29 20:00 0.00 391.74 371.90 13.20 07/29 21:00 0.00 391.72 372.04 13.20 07/29 22:00 0.00 391.70 372.04 13.20 07/29 23:00 0.00 391.68 372.06 13.20