Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/28 00:00 0.00 391.64 372.08 13.30 07/28 01:00 0.00 391.75 371.79 12.90 07/28 02:00 0.00 391.70 371.30 13.10 07/28 03:00 0.00 391.71 371.66 13.00 07/28 04:00 0.00 391.55 371.90 13.50 07/28 05:00 0.00 391.54 371.91 13.10 07/28 06:00 0.02 391.62 371.65 12.80 07/28 07:00 0.00 391.68 371.53 13.00 07/28 08:00 0.00 391.57 371.42 13.40 07/28 09:00 0.00 391.59 371.80 13.40 07/28 10:00 0.00 391.66 371.80 13.60 07/28 11:00 0.00 391.63 371.48 13.40 07/28 12:00 0.00 392.05 371.51 13.10 07/28 13:00 0.00 391.99 372.37 13.20 07/28 14:00 0.00 391.97 372.54 13.30 07/28 15:00 0.00 391.92 372.63 13.20 07/28 16:00 0.00 391.93 372.20 13.60 07/28 17:00 0.00 391.86 371.79 13.10 07/28 18:00 0.00 391.84 371.58 13.30 07/28 19:00 0.00 391.78 371.42 13.10 07/28 20:00 0.00 391.70 371.21 13.00 07/28 21:00 0.00 391.68 370.86 13.40 07/28 22:00 0.00 391.68 371.21 13.40 07/28 23:00 0.20 391.77 371.44 13.00