Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/07 00:00 0.00 391.26 371.58 13.20 11/07 01:00 ---- 391.52 371.55 13.10 11/07 01:00 0.00 391.49 371.60 13.40 11/07 02:00 0.00 391.49 371.57 13.90 11/07 03:00 0.00 391.45 371.55 13.80 11/07 04:00 0.00 391.43 371.57 13.50 11/07 05:00 0.00 391.48 371.52 13.10 11/07 06:00 0.00 391.50 371.51 13.40 11/07 07:00 0.00 391.56 371.52 13.30 11/07 08:00 0.00 391.62 371.49 13.80 11/07 09:00 0.00 391.66 371.20 13.30 11/07 10:00 0.00 391.66 371.63 13.90 11/07 11:00 0.00 391.67 371.60 13.30 11/07 12:00 0.00 391.70 371.58 13.30 11/07 13:00 0.00 391.71 371.61 14.00 11/07 14:00 0.00 391.72 371.59 13.40 11/07 15:00 0.00 391.73 371.63 13.80 11/07 16:00 0.00 391.74 371.65 13.60 11/07 17:00 0.00 391.70 371.62 13.80 11/07 18:00 0.00 391.71 371.64 13.30 11/07 19:00 0.00 391.72 371.68 13.90 11/07 20:00 0.00 391.72 371.65 13.30 11/07 21:00 0.00 391.72 371.59 13.50 11/07 22:00 0.00 391.59 371.48 13.40 11/07 23:00 0.00 391.72 371.06 13.10