Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/27 00:00 0.00 391.77 371.48 13.20 10/27 01:00 0.00 391.75 371.87 13.50 10/27 02:00 0.00 391.67 371.91 13.80 10/27 03:00 0.00 391.73 371.84 13.10 10/27 04:00 0.00 391.80 371.61 13.20 10/27 05:00 0.00 391.70 371.60 13.20 10/27 06:00 0.00 391.68 371.80 13.20 10/27 07:00 0.00 391.73 371.87 13.20 10/27 08:00 0.00 391.77 371.77 13.20 10/27 09:00 0.00 391.71 371.71 13.30 10/27 10:00 0.00 391.73 371.66 13.60 10/27 11:00 0.00 391.79 371.69 13.20 10/27 12:00 0.00 391.79 371.78 13.80 10/27 13:00 0.19 391.55 372.18 13.20 10/27 14:00 0.14 391.67 372.16 13.70 10/27 15:00 0.09 391.83 371.95 13.30 10/27 16:00 0.00 391.73 372.14 13.50 10/27 17:00 0.02 391.71 372.36 13.30 10/27 18:00 0.02 391.40 373.09 13.30 10/27 19:00 0.13 391.57 372.99 13.20 10/27 20:00 0.03 391.69 373.16 13.90 10/27 21:00 0.02 391.61 373.13 13.30 10/27 22:00 0.00 391.49 373.85 13.20 10/27 23:00 0.00 391.56 374.06 13.30