Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/26 00:00 0.00 391.56 371.26 13.10 10/26 01:00 0.00 391.62 371.36 13.50 10/26 02:00 0.00 391.76 371.60 13.80 10/26 03:00 0.00 391.67 371.87 13.40 10/26 04:00 0.00 391.65 371.80 13.10 10/26 05:00 0.00 391.67 371.46 13.10 10/26 06:00 0.00 391.74 371.46 13.20 10/26 07:00 0.00 391.65 371.59 13.20 10/26 08:00 0.00 391.65 371.73 13.80 10/26 09:00 0.00 391.87 371.84 13.30 10/26 10:00 0.00 391.95 371.96 13.20 10/26 11:00 0.00 391.91 372.17 13.20 10/26 12:00 0.00 391.62 371.64 13.20 10/26 13:00 0.00 391.53 371.28 13.30 10/26 14:00 0.00 391.59 370.64 13.70 10/26 15:00 0.00 391.52 371.87 13.20 10/26 16:00 0.00 391.60 371.91 13.90 10/26 17:00 0.00 391.54 371.77 13.30 10/26 18:00 0.00 391.79 371.68 13.20 10/26 19:00 0.00 391.97 371.84 13.70 10/26 20:00 0.00 392.14 371.93 13.50 10/26 21:00 0.00 392.07 371.81 13.80 10/26 22:00 0.00 391.78 371.72 13.40 10/26 23:00 0.00 391.64 371.39 13.30