Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/15 00:00 0.00 391.73 372.89 13.70 10/15 01:00 0.01 391.71 372.86 13.40 10/15 02:00 0.00 391.81 372.42 13.90 10/15 03:00 0.00 391.78 372.44 13.20 10/15 04:00 0.00 391.85 371.97 13.10 10/15 05:00 0.00 391.53 371.88 13.50 10/15 06:00 0.00 391.64 371.79 13.20 10/15 07:00 0.00 391.65 371.70 13.60 10/15 08:00 0.20 391.71 371.48 13.20 10/15 09:00 0.82 391.62 371.42 13.20 10/15 10:00 0.04 391.81 371.11 13.10 10/15 11:00 0.00 391.73 371.55 13.60 10/15 12:00 0.00 391.65 371.84 13.70 10/15 13:00 0.05 391.60 371.77 13.10 10/15 14:00 0.01 391.57 371.81 13.10 10/15 15:00 0.00 391.35 371.76 13.20 10/15 16:00 0.00 391.45 372.45 13.20 10/15 17:00 0.00 391.63 372.54 13.90 10/15 18:00 0.00 391.47 373.36 13.20 10/15 19:00 0.00 391.42 373.65 13.50 10/15 20:00 0.00 391.45 373.73 13.80 10/15 21:00 0.00 391.44 373.75 13.30 10/15 22:00 0.00 391.40 373.80 13.80 10/15 23:00 0.00 391.39 373.90 13.20