Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/14 00:00 0.01 391.61 375.39 13.40 10/14 01:00 0.68 391.74 375.71 13.90 10/14 02:00 0.52 391.83 375.92 13.40 10/14 03:00 0.09 391.88 375.99 13.20 10/14 04:00 0.08 391.91 376.06 13.30 10/14 05:00 0.06 391.86 376.11 13.30 10/14 06:00 0.16 391.82 375.97 13.20 10/14 07:00 0.00 391.99 375.13 13.60 10/14 08:00 0.03 391.85 374.46 13.20 10/14 09:00 0.00 391.46 372.96 13.30 10/14 10:00 0.00 391.42 371.91 13.30 10/14 11:00 0.04 391.53 371.40 13.30 10/14 12:00 0.00 391.54 371.20 13.70 10/14 13:00 0.01 391.56 371.39 13.70 10/14 14:00 0.13 391.63 371.24 13.20 10/14 15:00 0.00 391.72 370.95 13.80 10/14 16:00 0.00 391.71 371.22 13.60 10/14 17:00 0.00 391.71 371.72 13.10 10/14 18:00 0.00 391.72 372.62 13.10 10/14 19:00 0.00 391.79 372.84 13.20 10/14 20:00 0.00 391.76 372.93 13.20 10/14 21:00 0.00 391.73 372.97 13.20 10/14 22:00 0.00 391.71 373.08 13.60 10/14 23:00 0.00 391.69 373.30 13.20