Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/10 00:00 0.00 391.60 372.05 13.50 09/10 01:00 0.00 391.29 372.07 13.40 09/10 02:00 0.00 391.30 371.99 13.00 09/10 03:00 0.00 391.41 371.83 13.70 09/10 04:00 0.00 391.45 371.80 13.10 09/10 05:00 0.00 391.29 371.70 13.80 09/10 06:00 0.00 391.36 371.69 13.40 09/10 07:00 0.00 391.41 371.65 13.70 09/10 08:00 0.00 391.37 371.52 13.20 09/10 09:00 0.00 391.31 371.45 13.60 09/10 10:00 0.00 391.37 371.38 13.10 09/10 11:00 0.00 391.39 371.28 13.10 09/10 12:00 0.00 391.34 366.44 13.80 09/10 13:00 0.00 391.34 371.17 13.20 09/10 14:00 0.00 391.55 371.05 13.30 09/10 15:00 0.00 391.56 366.69 13.20 09/10 16:00 0.00 391.49 366.73 13.60 09/10 17:00 0.00 391.48 372.25 13.70 09/10 18:00 0.00 391.58 367.09 13.40 09/10 19:00 0.00 391.64 372.26 13.80 09/10 20:00 0.00 391.53 372.37 13.40 09/10 21:00 0.00 391.43 372.41 13.40 09/10 22:00 0.00 391.47 372.11 13.40 09/10 23:00 0.00 391.53 371.82 13.40