Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/09 00:00 0.00 391.62 372.37 13.30 09/09 01:00 0.00 391.61 372.31 13.80 09/09 02:00 0.00 391.63 372.31 13.10 09/09 03:00 0.00 391.65 372.38 13.20 09/09 04:00 0.00 391.51 372.40 13.20 09/09 05:00 0.00 391.47 372.37 13.20 09/09 06:00 0.00 391.43 372.37 13.10 09/09 07:00 0.00 391.38 372.35 13.00 09/09 08:00 0.00 391.32 372.33 13.10 09/09 09:00 0.00 391.27 372.32 13.40 09/09 10:00 0.00 391.23 371.99 13.10 09/09 11:00 0.00 391.20 371.87 13.00 09/09 12:00 0.00 391.21 371.83 13.10 09/09 13:00 0.00 391.17 372.07 13.50 09/09 14:00 0.00 391.20 372.16 13.00 09/09 15:00 0.00 391.42 372.08 13.10 09/09 16:00 0.00 391.41 372.54 13.00 09/09 17:00 0.00 391.43 372.64 13.00 09/09 18:00 0.00 391.44 372.56 13.50 09/09 19:00 0.00 391.45 372.50 13.10 09/09 20:00 0.00 391.46 372.55 13.10 09/09 21:00 0.00 391.50 372.25 13.40 09/09 22:00 0.00 391.35 371.99 13.50 09/09 23:00 0.00 391.39 372.05 13.70