Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/06 00:00 0.00 391.82 372.36 13.00 09/06 01:00 0.00 391.87 371.97 13.10 09/06 02:00 0.00 391.72 372.00 12.90 09/06 03:00 0.00 391.67 371.56 13.70 09/06 04:00 0.00 391.70 372.02 13.50 09/06 05:00 0.00 391.70 371.87 13.10 09/06 06:00 0.00 391.59 371.74 13.80 09/06 07:00 0.00 391.60 371.81 13.00 09/06 08:00 0.00 391.68 371.84 13.10 09/06 09:00 0.00 391.65 371.70 13.50 09/06 10:00 0.00 391.60 371.56 13.20 09/06 11:00 0.00 391.65 371.48 13.20 09/06 12:00 0.00 391.67 371.74 13.80 09/06 13:00 0.00 391.64 371.85 13.10 09/06 14:00 0.00 391.61 371.69 13.50 09/06 15:00 0.00 391.47 372.01 13.10 09/06 16:00 0.00 391.45 372.23 13.70 09/06 17:00 0.00 391.65 372.20 13.50 09/06 18:00 0.00 391.68 372.29 13.30 09/06 19:00 0.00 391.69 372.18 13.10 09/06 20:00 0.00 391.73 372.17 13.30 09/06 21:00 0.00 391.76 372.27 12.90 09/06 22:00 0.00 391.79 372.50 13.20 09/06 23:00 0.00 391.80 372.62 13.10