Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/05 00:00 0.00 391.74 371.17 13.00 09/05 01:00 0.00 391.47 371.70 13.40 09/05 02:00 0.00 391.40 372.01 13.10 09/05 03:00 0.71 391.62 372.15 13.60 09/05 04:00 0.46 391.70 371.94 13.70 09/05 05:00 0.63 391.62 371.66 13.20 09/05 06:00 0.04 391.72 371.81 13.10 09/05 07:00 0.03 391.82 372.15 13.20 09/05 08:00 0.00 391.76 372.14 12.80 09/05 09:00 0.00 391.70 371.97 12.80 09/05 10:00 0.00 391.78 371.84 12.90 09/05 11:00 0.01 391.79 371.95 13.10 09/05 12:00 0.00 391.73 372.16 13.60 09/05 13:00 0.00 391.73 372.06 13.00 09/05 14:00 0.00 391.78 371.97 13.10 09/05 15:00 0.00 391.75 371.82 13.50 09/05 16:00 0.00 391.73 372.04 12.90 09/05 17:00 0.00 391.89 372.41 13.00 09/05 18:00 0.00 391.95 372.45 12.90 09/05 19:00 0.00 391.89 372.30 13.20 09/05 20:00 0.00 391.87 372.12 13.10 09/05 21:00 0.00 391.93 372.08 13.00 09/05 22:00 0.00 391.87 372.41 13.00 09/05 23:00 0.00 391.83 372.46 13.00