Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/30 00:00 0.00 391.59 373.12 13.10 08/30 01:00 0.00 391.59 373.12 13.30 08/30 02:00 0.00 391.65 373.06 13.00 08/30 03:00 0.00 391.80 372.54 13.20 08/30 04:00 0.00 391.85 372.06 13.80 08/30 05:00 0.00 391.43 371.91 13.80 08/30 06:00 0.00 391.53 371.93 13.50 08/30 07:00 0.00 391.65 371.86 13.00 08/30 08:00 0.00 391.60 371.73 13.80 08/30 09:00 0.00 391.46 371.43 13.20 08/30 10:00 0.00 391.57 371.24 13.00 08/30 11:00 0.00 391.61 371.23 13.30 08/30 12:00 0.00 391.53 371.71 13.10 08/30 13:00 0.00 391.50 371.69 13.00 08/30 14:00 0.00 391.58 371.43 13.10 08/30 15:00 0.00 391.66 371.89 13.50 08/30 16:00 0.00 391.72 372.29 13.20 08/30 17:00 0.00 391.75 372.47 13.20 08/30 18:00 0.00 391.72 372.48 13.10 08/30 19:00 0.00 391.67 372.55 13.30 08/30 20:00 0.00 391.63 372.59 13.20 08/30 21:00 0.00 391.60 372.66 13.70 08/30 22:00 0.00 391.61 372.59 13.80 08/30 23:00 0.00 391.60 372.60 13.80