Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/29 00:00 0.00 391.79 372.66 13.00 08/29 01:00 0.00 391.76 372.83 13.70 08/29 02:00 0.00 391.66 372.63 13.10 08/29 03:00 0.00 391.70 372.05 13.70 08/29 04:00 0.00 391.86 371.75 13.10 08/29 05:00 0.00 391.60 371.89 13.10 08/29 06:00 0.00 391.57 371.84 13.00 08/29 07:00 0.00 391.69 372.00 13.10 08/29 08:00 0.00 391.73 371.80 13.20 08/29 09:00 0.00 391.58 371.75 13.80 08/29 10:00 0.00 391.67 372.38 13.20 08/29 11:00 0.00 391.62 371.96 13.70 08/29 12:00 0.00 391.67 372.20 13.70 08/29 13:00 0.00 391.59 372.25 13.10 08/29 14:00 0.00 391.61 372.30 13.60 08/29 15:00 0.00 391.55 372.65 13.60 08/29 16:00 0.00 391.48 372.79 13.10 08/29 17:00 0.00 391.49 372.85 13.70 08/29 18:00 0.00 391.52 372.88 13.10 08/29 19:00 0.00 391.52 372.85 13.20 08/29 20:00 0.00 391.52 372.96 13.30 08/29 21:00 0.00 391.51 373.06 13.40 08/29 22:00 0.00 391.56 373.06 13.10 08/29 23:00 0.00 391.57 373.08 13.70