Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/29 00:00 0.00 391.57 377.40 13.30 07/29 01:00 0.00 391.42 377.72 13.80 07/29 02:00 0.00 391.40 377.89 13.10 07/29 03:00 0.00 391.28 377.98 13.20 07/29 04:00 0.00 391.22 378.07 13.10 07/29 05:00 0.00 391.27 377.91 13.10 07/29 06:00 0.00 391.30 377.84 13.20 07/29 07:00 0.00 391.29 377.82 13.50 07/29 08:00 0.00 391.29 377.83 13.80 07/29 09:00 0.00 391.32 377.82 13.70 07/29 10:00 0.00 391.34 377.79 13.50 07/29 11:00 0.00 391.37 377.78 13.50 07/29 12:00 0.00 391.37 377.79 13.60 07/29 13:00 0.00 391.42 377.77 13.40 07/29 14:00 0.00 391.42 377.81 13.10 07/29 15:00 0.00 391.43 377.79 13.60 07/29 16:00 0.00 391.54 377.49 13.20 07/29 17:00 0.00 391.65 377.34 13.80 07/29 18:00 0.00 391.63 377.22 13.20 07/29 19:00 0.00 391.65 377.09 13.20 07/29 20:00 0.00 391.61 377.06 13.40 07/29 21:00 0.00 391.61 376.99 13.20 07/29 22:00 0.00 391.58 376.94 13.80 07/29 23:00 0.00 391.67 376.71 13.80