Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/28 00:00 0.00 391.50 377.20 13.60 07/28 01:00 0.00 391.45 377.23 13.70 07/28 02:00 0.00 391.38 377.27 13.80 07/28 03:00 0.00 391.37 377.29 13.40 07/28 04:00 0.00 391.32 377.27 13.70 07/28 05:00 0.00 391.31 377.20 13.10 07/28 06:00 0.00 391.27 377.21 13.40 07/28 07:00 0.00 391.20 377.27 13.20 07/28 08:00 0.00 391.13 377.28 13.50 07/28 09:00 0.00 391.15 377.15 13.60 07/28 10:00 0.00 391.14 377.05 13.30 07/28 11:00 0.00 391.15 377.02 13.10 07/28 12:00 0.00 391.31 376.50 13.80 07/28 13:00 0.00 391.45 376.37 13.30 07/28 14:00 0.00 391.44 376.83 13.50 07/28 15:00 0.00 391.40 377.29 13.60 07/28 16:00 0.00 391.42 377.46 13.20 07/28 17:00 0.00 391.48 377.43 13.20 07/28 18:00 0.00 391.20 377.45 13.30 07/28 19:00 0.00 391.28 377.38 13.30 07/28 20:00 0.00 391.33 377.42 13.40 07/28 21:00 0.00 391.40 377.39 13.30 07/28 22:00 0.00 391.43 377.40 13.20 07/28 23:00 0.00 391.51 377.40 13.40