Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/15 00:00 0.00 391.57 374.79 13.70 07/15 01:00 0.00 391.66 374.93 13.40 07/15 02:00 0.00 391.72 368.69 13.30 07/15 03:00 0.00 391.76 375.08 13.50 07/15 04:00 0.00 391.80 375.29 13.40 07/15 05:00 0.00 391.80 375.47 13.80 07/15 06:00 0.00 391.84 375.40 13.90 07/15 07:00 0.00 391.88 375.62 13.20 07/15 08:00 0.00 391.91 375.44 13.30 07/15 09:00 0.00 391.87 375.90 13.70 07/15 10:00 0.00 391.85 376.08 13.80 07/15 11:00 0.00 391.83 376.17 13.80 07/15 12:00 0.00 391.45 377.11 13.50 07/15 13:00 0.00 391.50 377.17 13.80 07/15 14:00 0.00 391.23 377.79 13.80 07/15 15:00 0.00 391.10 377.93 13.70 07/15 16:00 0.00 390.97 378.05 13.50 07/15 17:00 0.00 390.87 378.11 13.50 07/15 18:00 0.00 391.08 377.59 13.50 07/15 19:00 0.00 391.15 377.37 13.50 07/15 20:00 0.00 391.22 377.24 13.50 07/15 21:00 0.00 391.28 377.11 13.70 07/15 22:00 0.00 391.34 377.09 13.60 07/15 23:00 0.00 391.42 377.10 13.40