Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/14 00:00 0.00 391.50 374.94 13.30 07/14 01:00 0.00 391.50 374.91 13.30 07/14 02:00 0.00 391.49 374.90 13.40 07/14 03:00 0.00 391.50 374.88 13.20 07/14 04:00 0.00 391.48 374.89 13.70 07/14 05:00 0.00 391.47 374.78 13.50 07/14 06:00 0.00 391.44 374.87 13.80 07/14 07:00 0.00 391.41 374.86 13.40 07/14 08:00 0.00 391.31 374.99 13.90 07/14 09:00 0.00 391.41 373.87 13.30 07/14 10:00 0.00 391.36 374.53 13.40 07/14 11:00 0.00 391.38 374.39 13.20 07/14 12:00 0.00 391.40 374.35 13.80 07/14 13:00 0.00 391.38 374.33 13.60 07/14 14:00 0.00 391.35 374.28 13.20 07/14 15:00 0.00 391.35 374.22 13.30 07/14 16:00 0.00 391.49 373.83 13.30 07/14 17:00 0.00 391.41 373.95 13.70 07/14 18:00 0.00 391.46 373.91 13.20 07/14 19:00 0.00 391.48 373.91 13.30 07/14 20:00 0.00 391.48 373.87 13.40 07/14 21:00 0.00 391.52 373.85 13.40 07/14 22:00 0.00 391.50 374.20 13.30 07/14 23:00 0.00 391.51 374.59 13.30