Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/15 00:00 0.00 391.56 377.53 13.40 06/15 01:00 0.00 391.56 377.58 13.90 06/15 02:00 0.00 391.61 377.68 13.50 06/15 03:00 0.00 391.59 377.63 13.40 06/15 04:00 0.00 391.64 377.66 13.50 06/15 05:00 0.00 391.70 377.67 13.60 06/15 06:00 0.00 391.71 377.69 13.80 06/15 07:00 0.00 391.76 377.66 13.90 06/15 08:00 0.00 391.77 377.76 13.80 06/15 09:00 0.00 391.82 377.71 13.40 06/15 10:00 0.00 391.83 377.74 13.40 06/15 11:00 0.00 391.91 377.72 13.30 06/15 12:00 0.00 391.78 378.06 13.30 06/15 13:00 0.00 391.72 378.20 13.40 06/15 14:00 0.00 391.65 378.33 13.40 06/15 15:00 0.00 391.54 378.39 13.40 06/15 16:00 0.00 391.52 378.04 13.40 06/15 17:00 0.00 391.52 378.35 13.90 06/15 18:00 0.00 391.54 378.27 13.40 06/15 19:00 0.00 391.52 378.26 13.50 06/15 20:00 0.00 391.51 378.24 13.40 06/15 21:00 0.00 391.50 378.25 14.00 06/15 22:00 0.00 391.49 378.23 13.50 06/15 23:00 0.00 391.49 378.23 13.50