Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/14 00:00 0.00 391.31 376.44 13.40 06/14 01:00 0.00 391.31 376.12 13.50 06/14 02:00 0.00 391.37 375.88 13.60 06/14 03:00 0.00 391.36 375.74 13.30 06/14 04:00 0.00 391.39 375.61 13.90 06/14 05:00 0.00 391.42 375.51 13.50 06/14 06:00 0.00 391.43 375.47 13.70 06/14 07:00 0.00 391.43 375.42 13.50 06/14 08:00 0.00 391.45 375.42 13.50 06/14 09:00 0.00 391.33 375.95 13.30 06/14 10:00 0.00 391.50 375.91 13.30 06/14 11:00 0.00 391.50 376.10 13.60 06/14 12:00 0.00 391.55 376.24 13.80 06/14 13:00 0.00 391.59 376.38 13.40 06/14 14:00 0.00 391.62 376.45 13.50 06/14 15:00 0.00 391.67 376.30 13.40 06/14 16:00 0.00 391.69 376.51 13.50 06/14 17:00 0.00 391.55 376.91 13.40 06/14 18:00 0.00 391.53 377.14 13.40 06/14 19:00 0.00 391.50 377.28 13.70 06/14 20:00 0.00 391.49 377.34 13.80 06/14 21:00 0.00 391.50 377.36 13.70 06/14 22:00 0.00 391.47 377.45 13.40 06/14 23:00 0.00 391.51 377.50 13.80