Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/25 00:00 0.00 390.69 381.63 13.40 04/25 01:00 0.00 390.75 380.66 13.80 04/25 02:00 0.00 390.86 379.60 13.40 04/25 03:00 0.00 391.05 378.33 13.30 04/25 04:00 0.00 391.12 377.60 13.30 04/25 05:00 0.00 391.18 377.04 13.40 04/25 06:00 0.00 391.21 376.55 13.40 04/25 07:00 0.00 391.24 376.19 13.40 04/25 08:00 0.00 391.29 375.87 13.50 04/25 09:00 0.00 391.31 375.57 13.60 04/25 10:00 0.00 391.35 375.32 13.30 04/25 11:00 0.00 391.35 375.12 13.30 04/25 12:00 0.00 391.37 374.95 13.80 04/25 13:00 0.00 391.41 374.87 13.40 04/25 14:00 0.00 391.43 374.77 13.80 04/25 15:00 0.00 391.45 374.66 13.30 04/25 16:00 0.00 391.45 374.65 13.40 04/25 17:00 0.00 391.46 374.61 13.80 04/25 18:00 0.00 391.42 375.03 13.30 04/25 19:00 0.00 391.43 375.26 13.80 04/25 20:00 0.00 391.59 374.74 13.30 04/25 21:00 0.00 391.54 374.61 13.30 04/25 22:00 0.00 391.54 374.45 13.30 04/25 23:00 0.00 391.58 374.38 13.30