Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/24 00:00 0.18 391.55 373.31 13.40 04/24 01:00 0.12 391.59 373.45 13.30 04/24 02:00 0.02 391.59 373.42 13.70 04/24 03:00 0.11 391.65 373.44 13.30 04/24 04:00 0.11 391.64 367.88 13.30 04/24 05:00 0.03 391.66 373.68 13.40 04/24 06:00 0.10 391.77 373.80 13.30 04/24 07:00 0.20 391.79 374.53 13.30 04/24 08:00 0.18 391.61 375.49 13.80 04/24 09:00 0.05 391.41 376.27 13.40 04/24 10:00 0.00 391.25 377.69 13.60 04/24 11:00 0.00 390.96 379.13 13.30 04/24 12:00 0.00 390.68 380.43 13.50 04/24 13:00 0.00 390.43 381.65 13.30 04/24 14:00 0.00 390.12 382.78 13.30 04/24 15:00 0.00 389.65 383.88 13.40 04/24 16:00 0.00 389.51 384.15 13.80 04/24 17:00 0.00 389.47 384.39 13.40 04/24 18:00 0.00 389.46 384.51 13.40 04/24 19:00 0.00 389.37 384.58 13.80 04/24 20:00 0.00 389.77 384.06 13.40 04/24 21:00 0.00 389.89 383.96 13.70 04/24 22:00 0.00 390.37 383.14 13.30 04/24 23:00 0.00 390.35 382.64 13.70