ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
06/11 00:00 0.00 ---- 876.66 83987 406 1418 13.05 12.97
06/11 01:00 0.00 ---- 876.62 83882 469 1418 13.05 12.97
06/11 02:00 0.00 ---- 876.58 83778 469 1418 13.05 12.97
06/11 03:00 0.00 ---- 876.56 83725 405 1418 13.05 12.97
06/11 04:00 0.00 ---- 876.53 83647 468 1417 13.05 12.97
06/11 05:00 0.00 ---- 876.50 83568 468 1417 13.05 12.97
06/11 06:00 0.00 ---- 876.47 83490 405 1417 13.05 12.97
06/11 07:00 0.00 ---- 876.43 83386 404 1416 13.05 12.97
06/11 08:00 0.00 ---- 876.40 83307 404 1416 13.05 12.97
06/11 09:00 0.00 ---- 876.37 83229 404 1416 13.05 12.97
06/11 10:00 0.00 ---- 876.34 83150 466 1416 13.05 12.97
06/11 11:00 0.00 ---- 876.31 83072 466 1415 13.05 12.97
06/11 12:00 0.00 ---- 876.28 82993 529 1415 13.05 12.97
06/11 13:00 0.00 ---- 876.25 82915 466 1415 13.05 12.97
06/11 14:00 0.00 ---- 876.23 82862 529 1415 13.05 12.97
06/11 15:00 0.00 ---- 876.19 82758 529 1415 13.05 12.97
06/11 16:00 0.00 ---- 876.17 82706 528 1414 13.05 12.97
06/11 17:00 0.01 ---- 876.14 82627 465 1414 13.05 12.97
06/11 18:00 0.01 ---- 876.11 82549 528 1414 13.05 12.97
06/11 19:00 0.00 ---- 876.08 82470 465 1414 13.05 12.97
06/11 20:00 0.00 ---- 876.05 82392 404 1413 13.05 12.97
06/11 21:00 0.00 ---- 876.02 82313 404 1413 13.05 12.97
06/11 22:00 0.00 ---- 875.98 82210 283 1413 13.05 12.97
06/11 23:00 0.00 ---- 875.95 82133 ---- ---- 13.05 12.97
Data processed at Thu 12Jun2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.