ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
06/10 00:00 0.00 ---- 877.28 85625 646 1423 13.05 12.97
06/10 01:00 0.00 ---- 877.26 85571 646 1423 13.05 12.97
06/10 02:00 0.00 ---- 877.23 85491 581 1423 13.05 12.97
06/10 03:00 0.00 ---- 877.21 85438 581 1423 13.05 12.97
06/10 04:00 0.00 ---- 877.18 85357 581 1423 13.05 12.97
06/10 05:00 0.00 ---- 877.15 85277 516 1422 13.05 12.97
06/10 06:00 0.00 ---- 877.13 85224 516 1422 13.05 12.97
06/10 07:00 0.00 ---- 877.09 85117 516 1422 13.05 12.97
06/10 08:00 0.00 ---- 877.07 85063 580 1422 13.05 12.97
06/10 09:00 0.00 ---- 877.04 84983 517 1421 13.05 12.97
06/10 10:00 0.00 ---- 877.02 84929 649 1421 13.05 12.97
06/10 11:00 0.00 ---- 876.99 84850 652 1421 13.05 12.97
06/10 12:00 0.00 ---- 876.97 84798 656 1421 13.05 12.97
06/10 13:00 0.00 ---- 876.95 84745 659 1421 13.05 12.97
06/10 14:00 0.00 ---- 876.92 84667 725 1420 13.05 12.97
06/10 15:00 0.00 ---- 876.90 84615 661 1420 13.05 12.97
06/10 16:00 0.00 ---- 876.88 84562 597 1420 13.05 12.97
06/10 17:00 0.00 ---- 876.85 84484 660 1420 13.05 12.97
06/10 18:00 0.00 ---- 876.82 84405 597 1420 13.05 12.97
06/10 19:00 0.00 ---- 876.80 84353 533 1419 13.05 12.97
06/10 20:00 0.00 ---- 876.77 84275 533 1419 13.05 12.97
06/10 21:00 0.00 ---- 876.74 84196 533 1419 13.05 12.97
06/10 22:00 0.00 ---- 876.71 84118 470 1419 13.05 12.97
06/10 23:00 0.00 ---- 876.68 84039 ---- ---- 13.05 12.97
Data processed at Wed 11Jun2025 04:03 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.