ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
02/12 00:00 0.03 ---- 870.86 69771 212 1 13.05 12.97
02/12 01:00 0.01 ---- 870.87 69792 159 1 13.05 12.97
02/12 02:00 0.01 ---- 870.88 69814 159 1 13.05 12.97
02/12 03:00 0.00 ---- 870.88 69814 159 1 13.05 12.97
02/12 04:00 0.01 ---- 870.89 69836 107 1 13.05 12.97
02/12 05:00 0.01 ---- 870.89 69836 107 1 13.05 12.97
02/12 06:00 0.00 ---- 870.89 69836 159 1 13.05 12.97
02/12 07:00 0.00 ---- 870.90 69858 107 1 13.05 12.97
02/12 08:00 0.00 ---- 870.91 69880 159 1 13.05 12.97
02/12 09:00 0.00 ---- 870.91 69880 159 1 13.05 12.97
02/12 10:00 0.00 ---- 870.92 69902 159 1 13.05 12.97
02/12 11:00 0.00 ---- 870.92 69902 107 1 13.05 12.97
02/12 12:00 0.00 ---- 870.93 69923 107 1 13.05 12.97
02/12 13:00 0.00 ---- 870.93 69923 54 1 13.05 12.97
02/12 14:00 0.00 ---- 870.93 69923 54 1 13.05 12.97
02/12 15:00 0.00 ---- 870.94 69945 54 1 13.05 12.97
02/12 16:00 0.00 ---- 870.93 69923 54 1 13.05 12.97
02/12 17:00 0.00 ---- 870.94 69945 107 1 13.05 12.97
02/12 18:00 0.00 ---- 870.94 69945 107 1 13.05 12.97
02/12 19:00 0.00 ---- 870.95 69967 107 1 13.05 12.97
02/12 20:00 0.00 ---- 870.95 69967 54 1 13.05 12.97
02/12 21:00 0.00 ---- 870.95 69967 54 1 13.05 12.97
02/12 22:00 0.00 ---- 870.95 69967 1 1 13.05 12.97
02/12 23:00 0.00 ---- 870.96 69989 ---- ---- 13.05 12.97
Data processed at Tue 13Feb2024 05:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.