ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
02/11 00:00 0.00 ---- 870.74 69509 1 1 13.05 12.97
02/11 01:00 0.00 ---- 870.74 69509 1 1 13.05 12.97
02/11 02:00 0.00 ---- 870.74 69509 1 1 13.05 12.97
02/11 03:00 0.00 ---- 870.74 69509 1 1 13.05 12.97
02/11 04:00 0.00 ---- 870.74 69509 1 1 13.05 12.97
02/11 05:00 0.00 ---- 870.74 69509 107 1 13.05 12.97
02/11 06:00 0.01 ---- 870.74 69509 107 1 13.05 12.97
02/11 07:00 0.21 ---- 870.76 69552 212 1 13.05 12.97
02/11 08:00 0.11 ---- 870.76 69552 265 1 13.05 12.97
02/11 09:00 0.14 ---- 870.78 69596 265 1 13.05 12.97
02/11 10:00 0.10 ---- 870.79 69618 159 1 13.05 12.97
02/11 11:00 0.01 ---- 870.79 69618 212 1 13.05 12.97
02/11 12:00 0.00 ---- 870.79 69618 159 1 13.05 12.97
02/11 13:00 0.03 ---- 870.80 69640 107 1 13.05 12.97
02/11 14:00 0.01 ---- 870.81 69661 159 1 13.05 12.97
02/11 15:00 0.02 ---- 870.81 69661 159 1 13.05 12.97
02/11 16:00 0.05 ---- 870.82 69683 159 1 13.05 12.97
02/11 17:00 0.03 ---- 870.82 69683 107 1 13.05 12.97
02/11 18:00 0.01 ---- 870.83 69705 159 1 13.05 12.97
02/11 19:00 0.01 ---- 870.83 69705 107 1 13.05 12.97
02/11 20:00 0.09 ---- 870.84 69727 159 1 13.05 12.97
02/11 21:00 0.04 ---- 870.84 69727 107 1 13.05 12.97
02/11 22:00 0.03 ---- 870.85 69749 212 1 13.05 12.97
02/11 23:00 0.03 ---- 870.86 69771 ---- ---- 13.05 12.97
Data processed at Mon 12Feb2024 05:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.