ANDO2: Washita River, OK

                                SHEF ID:       ANDO2     Washita River at Anadarko, OK
STATION TYPE:
Regulating: Stage = 19.00, Flow = 6702

PRECIP PRECIP(A) STAGE RIV-FLOW BAT-LOAD
in in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/11 00:00 ---- 0.00 10.81 1775 12.40
06/11 01:00 ---- 0.00 10.76 1752 12.37
06/11 02:00 ---- 0.00 10.71 1729 12.36
06/11 03:00 ---- 0.00 10.67 1710 12.35
06/11 04:00 ---- 0.00 10.61 1683 12.34
06/11 05:00 ---- 0.00 10.63 1692 12.33
06/11 06:00 ---- 0.00 10.59 1674 12.31
06/11 07:00 ---- 0.00 10.60 1678 12.31
06/11 08:00 ---- 0.00 10.62 1687 12.86
06/11 09:00 ---- 0.00 10.62 1687 13.20
06/11 10:00 ---- 0.00 10.60 1678 13.24
06/11 11:00 ---- 0.00 10.65 1701 13.18
06/11 12:00 ---- 0.00 10.62 1687 13.22
06/11 13:00 ---- 0.00 10.66 1706 13.30
06/11 14:00 ---- 0.00 10.68 1715 13.41
06/11 15:00 ---- 0.00 10.66 1706 13.24
06/11 16:00 ---- 0.00 10.70 1724 13.17
06/11 17:00 ---- 0.00 10.69 1720 13.17
06/11 18:00 ---- 0.00 10.73 1738 13.09
06/11 19:00 ---- 0.00 10.72 1733 13.09
06/11 20:00 ---- 0.00 10.72 1733 13.08
06/11 21:00 ---- 0.00 10.72 1733 12.85
06/11 22:00 ---- 0.00 10.73 1738 12.59
06/11 23:00 ---- 0.00 10.70 1724 12.47
Data processed at Thu 12Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ANAD.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ANAD.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ANAD.Stage.Inst.1Hour.0.Ccp-Rev
ANAD.Flow.Inst.1Hour.0.Ccp-Rev
ANAD.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.