ANDO2: Washita River, OK

                                SHEF ID:       ANDO2     Washita River at Anadarko, OK
STATION TYPE:
Regulating: Stage = 19.00, Flow = 6702

PRECIP PRECIP(A) STAGE RIV-FLOW BAT-LOAD
in in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/10 00:00 ---- 0.00 11.98 2347 12.40
06/10 01:00 ---- 0.00 11.92 2316 12.37
06/10 02:00 ---- 0.00 11.88 2295 12.36
06/10 03:00 ---- 0.00 11.82 2264 12.34
06/10 04:00 ---- 0.00 11.77 2239 12.34
06/10 05:00 ---- 0.00 11.71 2208 12.33
06/10 06:00 ---- 0.00 11.67 2188 12.32
06/10 07:00 ---- 0.00 11.66 2183 12.33
06/10 08:00 ---- 0.00 11.62 2162 13.05
06/10 09:00 ---- 0.00 11.57 2137 13.24
06/10 10:00 ---- 0.00 11.51 2107 13.28
06/10 11:00 ---- 0.00 11.44 2073 13.32
06/10 12:00 ---- 0.00 11.40 2054 13.28
06/10 13:00 ---- 0.00 11.36 2035 13.32
06/10 14:00 ---- 0.00 11.30 2006 13.48
06/10 15:00 ---- 0.00 11.25 1982 13.16
06/10 16:00 ---- 0.00 11.20 1958 13.22
06/10 17:00 ---- 0.00 11.14 1930 13.11
06/10 18:00 ---- 0.00 11.12 1921 13.15
06/10 19:00 ---- 0.00 11.08 1902 13.03
06/10 20:00 ---- 0.00 11.03 1878 13.03
06/10 21:00 ---- 0.00 10.98 1855 12.82
06/10 22:00 ---- 0.00 10.91 1822 12.54
06/10 23:00 ---- 0.00 10.83 1784 12.44
Data processed at Wed 11Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ANAD.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ANAD.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ANAD.Stage.Inst.1Hour.0.Ccp-Rev
ANAD.Flow.Inst.1Hour.0.Ccp-Rev
ANAD.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.