WWCO2: Wewoka Creek nr Wetumka OK

                                SHEF ID:       WWCO2     Wewoka Creek nr Wetumka OK
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/07 00:00 0.05 5.08 21 12.65 12.57
04/07 01:00 0.00 5.10 24 12.65 12.57
04/07 02:00 0.23 5.15 30 12.65 12.57
04/07 03:00 0.01 5.16 31 12.65 12.57
04/07 04:00 0.00 5.21 33 12.65 12.49
04/07 05:00 0.00 5.22 34 12.57 12.49
04/07 06:00 0.00 5.25 35 12.57 12.49
04/07 07:00 0.00 5.29 36 12.57 12.41
04/07 08:00 0.00 5.33 37 12.57 12.41
04/07 09:00 0.00 5.41 45 12.65 12.49
04/07 10:00 0.00 5.47 52 13.21 13.05
04/07 11:00 0.00 5.92 103 13.68 13.29
04/07 12:00 0.00 6.42 167 13.44 13.29
04/07 13:00 0.00 6.69 203 13.29 13.29
04/07 14:00 0.00 6.85 225 13.37 13.53
04/07 15:00 0.00 7.01 248 13.44 13.76
04/07 16:00 0.00 7.11 268 13.53 13.44
04/07 17:00 0.00 7.13 273 13.68 13.05
04/07 18:00 0.00 7.10 266 13.60 12.97
04/07 19:00 0.00 7.09 264 14.00 12.97
04/07 20:00 0.00 7.02 250 13.05 12.89
04/07 21:00 0.00 6.96 240 12.81 12.65
04/07 22:00 0.00 6.95 238 12.73 12.65
04/07 23:00 0.00 6.87 227 12.65 12.57
Data processed at Mon 08Apr2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
WEWO.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
WEWO.Stage.Inst.1Hour.0.Ccp-Rev
WEWO.Flow.Inst.1Hour.0.Ccp-Rev
WEWO.Volt-Battery.Inst.1Hour.0.Ccp-Rev
WEWO.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.