WCOM7: Spring River, Waco, MO

                                SHEF ID:       WCOM7     Spring R A - Waco MO
STATION TYPE: Stream Gauge
Regulating: Stage = 19.00, Flow = 17743

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/19 00:00 0.00 5.18 2429 12.61
07/19 01:00 0.00 5.19 2438 12.59
07/19 02:00 0.00 5.14 2395 12.57
07/19 03:00 0.00 5.07 2335 12.54
07/19 04:00 0.00 5.02 2293 12.51
07/19 05:00 0.00 4.89 2184 12.49
07/19 06:00 0.00 4.81 2118 12.46
07/19 07:00 0.00 4.68 2012 12.46
07/19 08:00 0.00 4.56 1914 12.55
07/19 09:00 0.00 4.48 1850 12.96
07/19 10:00 0.00 4.35 1746 13.30
07/19 11:00 0.00 4.24 1660 13.42
07/19 12:00 0.00 4.09 1545 13.36
07/19 13:00 0.00 3.98 1460 13.35
07/19 14:00 0.00 3.87 1378 13.38
07/19 15:00 0.00 3.69 1243 13.34
07/19 16:00 0.00 3.63 1198 13.31
07/19 17:00 0.00 3.50 1104 13.26
07/19 18:00 0.00 3.42 1048 13.30
07/19 19:00 0.00 3.35 1000 13.29
07/19 20:00 ---- ---- ---- ----
07/19 21:00 ---- ---- ---- ----
07/19 22:00 ---- ---- ---- ----
07/19 23:00 ---- ---- ---- ----
Data processed at Sun 20Jul2025 00:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
WACO.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
WACO.Stage.Inst.1Hour.0.Ccp-Rev
WACO.Flow.Inst.1Hour.0.Ccp-Rev
WACO.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.