WCOM7: Spring River, Waco, MO

                                SHEF ID:       WCOM7     Spring R A - Waco MO
STATION TYPE: Stream Gauge
Regulating: Stage = 19.00, Flow = 17743

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/24 00:00 0.00 1.38 160 12.79
02/24 01:00 0.00 1.39 163 12.77
02/24 02:00 0.00 1.38 160 12.73
02/24 03:00 0.00 1.39 163 12.71
02/24 04:00 0.00 1.39 163 12.69
02/24 05:00 0.00 1.40 166 12.67
02/24 06:00 0.00 1.40 166 12.67
02/24 07:00 0.00 1.41 169 12.65
02/24 08:00 0.00 1.41 169 12.73
02/24 09:00 0.00 1.41 169 13.26
02/24 10:00 0.00 1.41 169 14.01
02/24 11:00 0.00 1.42 172 14.01
02/24 12:00 0.00 1.42 172 13.95
02/24 13:00 0.00 1.44 179 13.95
02/24 14:00 0.00 1.43 175 13.91
02/24 15:00 0.00 1.44 179 13.83
02/24 16:00 0.00 1.44 179 13.78
02/24 17:00 0.00 1.44 179 13.76
02/24 18:00 0.00 1.45 182 13.53
02/24 19:00 0.00 1.46 185 13.13
02/24 20:00 0.00 1.47 188 12.93
02/24 21:00 0.00 1.48 192 12.88
02/24 22:00 0.00 1.50 198 12.86
02/24 23:00 0.00 1.50 198 12.83
Data processed at Tue 25Feb2025 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
WACO.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
WACO.Stage.Inst.1Hour.0.Ccp-Rev
WACO.Flow.Inst.1Hour.0.Ccp-Rev
WACO.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.