VCFK1: Floodway at L Arkansas R nr Valley Center, KS

                                SHEF ID:       VCFK1     FLOODWAY AT L ARKANSAS R AT VALL
STATION TYPE:

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/03 00:00 0.00 5.14 1825 12.09
09/03 01:00 0.00 5.04 1704 12.07
09/03 02:00 0.00 4.94 1587 12.05
09/03 03:00 0.00 4.85 1485 12.05
09/03 04:00 0.00 4.72 1345 12.04
09/03 05:00 0.00 4.59 1211 12.02
09/03 06:00 0.00 4.45 1075 12.03
09/03 07:00 0.00 4.30 938 12.02
09/03 08:00 0.00 4.11 779 12.01
09/03 09:00 0.00 3.93 641 12.04
09/03 10:00 0.00 3.74 485 12.51
09/03 11:00 0.00 3.55 346 12.78
09/03 12:00 0.00 3.35 225 12.98
09/03 13:00 0.00 3.06 97 13.09
09/03 14:00 0.00 2.77 22 12.93
09/03 15:00 0.00 2.58 3 12.87
09/03 16:00 0.00 2.58 3 12.88
09/03 17:00 0.00 2.58 3 12.80
09/03 18:00 0.00 2.58 3 12.76
09/03 19:00 0.00 2.58 3 12.64
09/03 20:00 0.00 2.58 3 12.31
09/03 21:00 0.00 2.58 3 12.25
09/03 22:00 0.00 2.58 3 12.23
09/03 23:00 0.00 2.58 3 12.21
Data processed at Thu 04Sep2025 04:12 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
VALF.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
VALF.Stage.Inst.1Hour.0.Ccp-Rev
VALF.Flow.Inst.1Hour.0.Ccp-Rev
VALF.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.