VCFK1: Floodway at L Arkansas R nr Valley Center, KS

                                SHEF ID:       VCFK1     FLOODWAY AT L ARKANSAS R AT VALL
STATION TYPE:

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/30 00:00 0.00 4.19 653 12.30
05/30 01:00 0.00 4.21 673 12.27
05/30 02:00 0.00 4.23 693 12.25
05/30 03:00 0.00 4.24 787 12.23
05/30 04:00 0.00 4.24 787 12.21
05/30 05:00 0.00 4.23 776 12.18
05/30 06:00 0.00 4.23 776 12.17
05/30 07:00 0.00 4.21 755 12.14
05/30 08:00 0.00 4.19 734 12.13
05/30 09:00 0.00 4.15 693 12.11
05/30 10:00 0.00 4.11 653 12.39
05/30 11:00 0.00 4.05 596 12.74
05/30 12:00 0.00 4.00 551 12.81
05/30 13:00 0.00 3.95 508 12.52
05/30 14:00 0.00 3.87 444 12.55
05/30 15:00 0.00 3.80 391 13.03
05/30 16:00 0.00 3.71 330 13.06
05/30 17:00 0.00 3.60 263 12.93
05/30 18:00 0.00 3.50 210 12.81
05/30 19:00 0.00 3.41 168 12.61
05/30 20:00 0.00 3.31 128 12.40
05/30 21:00 0.00 3.18 85 12.35
05/30 22:00 0.00 3.06 54 12.34
05/30 23:00 0.00 2.92 28 12.34
Data processed at Sat 31May2025 04:12 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
VALF.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
VALF.Stage.Inst.1Hour.0.Ccp-Rev
VALF.Flow.Inst.1Hour.0.Ccp-Rev
VALF.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.