UNGO2: Muddy Boggy, Unger, OK

                                SHEF ID:       UNGO2     Muddy Boggy Creek near Unger, OK
STATION TYPE:
Regulating: Stage = 39.00, Flow = 17600

PRECIP STAGE STAGE(2) RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/26 00:00 0.00 27.24 ---- 7170 12.97
04/26 01:00 0.00 27.03 ---- 7020 12.97
04/26 02:00 0.00 26.80 ---- 6860 12.89
04/26 03:00 0.00 26.58 ---- 6710 12.89
04/26 04:00 0.00 26.36 ---- 6560 12.89
04/26 05:00 0.00 26.16 ---- 6420 12.89
04/26 06:00 0.00 25.95 ---- 6290 12.81
04/26 07:00 0.00 25.76 ---- 6160 12.81
04/26 08:00 0.00 25.55 ---- 6020 12.89
04/26 09:00 0.00 25.37 ---- 5900 13.05
04/26 10:00 0.00 25.17 ---- 5780 13.21
04/26 11:00 0.00 25.00 ---- 5670 13.29
04/26 12:00 0.00 24.82 ---- 5560 13.37
04/26 13:00 0.00 24.65 ---- 5450 13.29
04/26 14:00 0.00 24.51 ---- 5360 13.21
04/26 15:00 0.08 24.35 ---- 5280 13.13
04/26 16:00 0.50 24.25 ---- 5220 13.13
04/26 17:00 0.00 24.15 ---- 5170 13.21
04/26 18:00 0.00 24.03 ---- 5100 13.29
04/26 19:00 0.00 23.94 ---- 5060 13.21
04/26 20:00 0.00 23.91 ---- 5040 13.13
04/26 21:00 0.00 23.90 ---- 5030 13.05
04/26 22:00 0.00 23.89 ---- 5030 13.05
04/26 23:00 0.00 23.90 ---- 5030 12.97
Data processed at Sun 27Apr2025 04:47 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
UNGE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
UNGE.Stage.Inst.1Hour.0.Ccp-Rev
UNGE.Stage-Alt.Inst.1Hour.0.Ccp-Rev
UNGE.Flow.Inst.1Hour.0.Ccp-Rev
UNGE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.