TONO2: Salt Fork Arkansas R., Tonkawa, OK

                                
SHEF ID:       TONO2     Salt Fork Arkansas River at Tonk
STATION TYPE:  
Regulating: Stage =    17.00, Flow =    10848

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/16 00:00      0.00      4.63      ----       586     12.73
08/16 01:00      0.00      4.66      ----       599     12.73
08/16 02:00      0.00      4.68      ----       608     12.73
08/16 03:00      0.00      4.68      ----       608     12.65
08/16 04:00      0.00      4.72      ----       626     12.65
08/16 05:00      0.00      4.73      ----       630     12.65
08/16 06:00      0.00      4.75      ----       639     12.65
08/16 07:00      0.00      4.74      ----       634     12.65
08/16 08:00      0.00      4.76      ----       643     12.73
08/16 09:00      0.00      4.75      ----       639     13.29
08/16 10:00      0.00      4.77      ----       647     13.84
08/16 11:00      0.00      4.78      ----       652     14.00
08/16 12:00      0.00      4.78      ----       652     13.13
08/16 13:00      0.00      4.77      ----       647     13.05
08/16 14:00      0.00      4.78      ----       652     13.21
08/16 15:00      0.00      4.79      ----       656     13.13
08/16 16:00      0.00      4.78      ----       652     13.05
08/16 17:00      0.00      4.77      ----       647     12.97
08/16 18:00      0.00      4.74      ----       634     12.97
08/16 19:00      0.00      4.72      ----       626     12.89
08/16 20:00      0.00      4.72      ----       626     12.97
08/16 21:00      0.00      4.70      ----       617     12.81
08/16 22:00      0.00      4.72      ----       626     12.73
08/16 23:00      0.00      4.72      ----       626     12.73

                            
Data processed at Thu 17Aug2023 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
TONK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
TONK.Stage.Inst.1Hour.0.Ccp-Rev
TONK.Stage-Alt.Inst.1Hour.0.Ccp-Rev
TONK.Flow.Inst.1Hour.0.Ccp-Rev
TONK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.