TONO2: Salt Fork Arkansas R., Tonkawa, OK

                                
SHEF ID:       TONO2     Salt Fork Arkansas River at Tonk
STATION TYPE:  
Regulating: Stage =    17.00, Flow =    10848

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/11 00:00      0.00      5.40      ----       951     12.73
08/11 01:00      0.00      5.36      ----       931     12.73
08/11 02:00      0.00      5.32      ----       910     12.73
08/11 03:00      0.00      5.30      ----       900     12.73
08/11 04:00      0.00      5.29      ----       895     12.65
08/11 05:00      0.00      5.28      ----       890     12.65
08/11 06:00      0.00      5.26      ----       880     12.65
08/11 07:00      0.00      5.23      ----       864     12.65
08/11 08:00      0.00      5.20      ----       849     12.81
08/11 09:00      0.00      5.22      ----       859     13.29
08/11 10:00      0.00      5.21      ----       854     13.68
08/11 11:00      0.00      5.19      ----       844     13.84
08/11 12:00      0.00      5.23      ----       864     13.13
08/11 13:00      0.00      5.20      ----       849     13.05
08/11 14:00      0.00      5.20      ----       849     12.89
08/11 15:00      0.00      5.17      ----       834     12.89
08/11 16:00      0.00      5.14      ----       820     12.81
08/11 17:00      0.00      5.17      ----       834     12.81
08/11 18:00      0.00      5.16      ----       829     12.81
08/11 19:00      0.00      5.12      ----       810     12.81
08/11 20:00      0.00      5.09      ----       795     12.89
08/11 21:00      0.00      5.09      ----       795     12.81
08/11 22:00      0.00      5.08      ----       790     12.81
08/11 23:00      0.00      5.05      ----       776     12.73

                            
Data processed at Sat 12Aug2023 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
TONK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
TONK.Stage.Inst.1Hour.0.Ccp-Rev
TONK.Stage-Alt.Inst.1Hour.0.Ccp-Rev
TONK.Flow.Inst.1Hour.0.Ccp-Rev
TONK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.