TONO2: Salt Fork Arkansas R., Tonkawa, OK

                                
SHEF ID:       TONO2     Salt Fork Arkansas River at Tonk
STATION TYPE:  
Regulating: Stage =    17.00, Flow =    10848

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/09 00:00      0.00      5.49      ----       998     12.73
08/09 01:00      0.00      5.52      ----      1014     12.73
08/09 02:00      0.00      5.52      ----      1014     12.73
08/09 03:00      0.00      5.51      ----      1009     12.73
08/09 04:00      0.00      5.54      ----      1025     12.73
08/09 05:00      0.00      5.52      ----      1014     12.73
08/09 06:00      0.00      5.53      ----      1020     12.65
08/09 07:00      0.00      5.54      ----      1025     12.65
08/09 08:00      0.00      5.52      ----      1014     12.65
08/09 09:00      0.00      5.51      ----      1009     13.05
08/09 10:00      0.00      5.52      ----      1014     13.84
08/09 11:00      0.00      5.50      ----      1004     14.00
08/09 12:00      0.00      5.50      ----      1004     13.29
08/09 13:00      0.00      5.53      ----      1020     13.05
08/09 14:00      0.00      5.53      ----      1020     13.13
08/09 15:00      0.00      5.54      ----      1025     12.89
08/09 16:00      0.00      5.56      ----      1036     13.05
08/09 17:00      0.00      5.60      ----      1057      ----
08/09 18:00      0.00      5.61      ----      1063     13.05
08/09 19:00      0.00      5.66      ----      1089     12.97
08/09 20:00      0.00      5.71      ----      1115     13.05
08/09 21:00      0.00      5.78      ----      1152     12.81
08/09 22:00      0.00      5.83      ----      1179     12.81
08/09 23:00      0.00      5.87      ----      1201     12.73

                            
Data processed at Thu 10Aug2023 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
TONK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
TONK.Stage.Inst.1Hour.0.Ccp-Rev
TONK.Stage-Alt.Inst.1Hour.0.Ccp-Rev
TONK.Flow.Inst.1Hour.0.Ccp-Rev
TONK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.