TONO2: Salt Fork Arkansas R., Tonkawa, OK

                                
SHEF ID:       TONO2     Salt Fork Arkansas River at Tonk
STATION TYPE:  
Regulating: Stage =    17.00, Flow =    10848

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/07 00:00      0.00      5.89      ----      1212     12.73
08/07 01:00      0.00      5.97      ----      1256     12.73
08/07 02:00      0.00      6.02      ----      1284     12.73
08/07 03:00      0.06      6.04      ----      1296     12.73
08/07 04:00      0.09      6.08      ----      1318     12.73
08/07 05:00      0.02      6.07      ----      1313     12.73
08/07 06:00      0.00      6.02      ----      1284     12.65
08/07 07:00      0.00      5.96      ----      1251     12.65
08/07 08:00      0.00      5.89      ----      1212     12.73
08/07 09:00      0.00      5.79      ----      1158     13.29
08/07 10:00      0.00      5.69      ----      1105     13.92
08/07 11:00      0.00      5.61      ----      1063     14.00
08/07 12:00      0.00      5.49      ----       998     13.29
08/07 13:00      0.00      5.44      ----       972     13.29
08/07 14:00      0.00      5.39      ----       946     13.21
08/07 15:00      0.00      5.35      ----       926     13.21
08/07 16:00      0.00      5.33      ----       915     12.97
08/07 17:00      0.00      5.30      ----       900     12.97
08/07 18:00      0.00      5.33      ----       915     12.97
08/07 19:00      0.00      5.34      ----       920     12.89
08/07 20:00      0.00      5.37      ----       936     13.05
08/07 21:00      0.00      5.40      ----       951     12.89
08/07 22:00      0.00      5.41      ----       956     12.81
08/07 23:00      0.00      5.46      ----       983     12.73

                            
Data processed at Tue 08Aug2023 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
TONK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
TONK.Stage.Inst.1Hour.0.Ccp-Rev
TONK.Stage-Alt.Inst.1Hour.0.Ccp-Rev
TONK.Flow.Inst.1Hour.0.Ccp-Rev
TONK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.