TONO2: Salt Fork Arkansas R., Tonkawa, OK

                                
SHEF ID:       TONO2     Salt Fork Arkansas River at Tonk
STATION TYPE:  
Regulating: Stage =    17.00, Flow =    10848

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/04 00:00      0.00      4.64      ----       591     12.73
08/04 01:00      0.00      4.65      ----       595     12.73
08/04 02:00      0.00      4.63      ----       586     12.73
08/04 03:00      0.00      4.64      ----       591     12.73
08/04 04:00      0.00      4.63      ----       586     12.73
08/04 05:00      0.00      4.62      ----       582     12.65
08/04 06:00      0.00      4.61      ----       578     12.65
08/04 07:00      0.00      4.62      ----       582     12.65
08/04 08:00      0.00      4.60      ----       573     12.73
08/04 09:00      0.00      4.59      ----       569     13.05
08/04 10:00      0.00      4.59      ----       569     13.60
08/04 11:00      0.00      4.61      ----       578     13.84
08/04 12:00      0.00      4.58      ----       565     13.68
08/04 13:00      0.00      4.57      ----       560     13.21
08/04 14:00      0.00      4.56      ----       556     13.05
08/04 15:00      0.00      4.57      ----       560     13.05
08/04 16:00      0.00      4.54      ----       548     12.97
08/04 17:00      0.00      4.54      ----       548     12.89
08/04 18:00      0.00      4.53      ----       544     12.89
08/04 19:00      0.00      4.50      ----       531     12.81
08/04 20:00      0.00      4.50      ----       531     12.89
08/04 21:00      0.00      4.48      ----       523     12.81
08/04 22:00      0.00      4.47      ----       519     12.81
08/04 23:00      0.00      4.46      ----       515     12.81

                            
Data processed at Sat 05Aug2023 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
TONK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
TONK.Stage.Inst.1Hour.0.Ccp-Rev
TONK.Stage-Alt.Inst.1Hour.0.Ccp-Rev
TONK.Flow.Inst.1Hour.0.Ccp-Rev
TONK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.