TONO2: Salt Fork Arkansas R., Tonkawa, OK

                                
SHEF ID:       TONO2     Salt Fork Arkansas River at Tonk
STATION TYPE:  
Regulating: Stage =    17.00, Flow =    10848

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
07/31 00:00      0.00      5.59      ----      1052     12.73
07/31 01:00      0.00      5.56      ----      1036     12.73
07/31 02:00      0.00      5.57      ----      1041     12.73
07/31 03:00      0.00      5.57      ----      1041     12.73
07/31 04:00      0.00      5.55      ----      1030     12.73
07/31 05:00      0.00      5.54      ----      1025     12.65
07/31 06:00      0.00      5.54      ----      1025     12.65
07/31 07:00      0.00      5.51      ----      1009     12.65
07/31 08:00      0.00      5.50      ----      1004     12.81
07/31 09:00      0.00      5.50      ----      1004     13.29
07/31 10:00      0.00      5.47      ----       988     13.68
07/31 11:00      0.00      5.50      ----      1004     13.92
07/31 12:00      0.00      5.46      ----       983     13.21
07/31 13:00      0.00      5.48      ----       993     12.97
07/31 14:00      0.00      5.45      ----       977     12.89
07/31 15:00      0.00      5.45      ----       977     13.05
07/31 16:00      0.00      5.44      ----       972     12.89
07/31 17:00      0.00      5.41      ----       956     12.81
07/31 18:00      0.00      5.41      ----       956     12.81
07/31 19:00      0.00      5.37      ----       936     12.81
07/31 20:00      0.00      5.38      ----       941     12.97
07/31 21:00      0.00      5.34      ----       920     12.81
07/31 22:00      0.00      5.32      ----       910     12.81
07/31 23:00      0.00      5.32      ----       910     12.81

                            
Data processed at Tue 01Aug2023 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
TONK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
TONK.Stage.Inst.1Hour.0.Ccp-Rev
TONK.Stage-Alt.Inst.1Hour.0.Ccp-Rev
TONK.Flow.Inst.1Hour.0.Ccp-Rev
TONK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.